Customized Spiral Stairs Railing Balustrade Spiral Staircase with Glass Steps

Product Details
Customization: Available
Structure: Spiral
Bench: Single Stair
Still deciding? Get samples of US$ 0/Step
Request Sample
Manufacturer/Factory, Trading Company

360° Virtual Tour

Diamond Member Since 2016

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Plant Area
>2000 square meters
Management System Certification
ISO 9001, GMP, BSCI
  • Customized Spiral Stairs Railing Balustrade Spiral Staircase with Glass Steps
  • Customized Spiral Stairs Railing Balustrade Spiral Staircase with Glass Steps
  • Customized Spiral Stairs Railing Balustrade Spiral Staircase with Glass Steps
  • Customized Spiral Stairs Railing Balustrade Spiral Staircase with Glass Steps
  • Customized Spiral Stairs Railing Balustrade Spiral Staircase with Glass Steps
  • Customized Spiral Stairs Railing Balustrade Spiral Staircase with Glass Steps
Find Similar Products

Basic Info.

Model NO.
ACE-ST077
Type
Ordinary Stairs
Material
Tempered Glass
Usage
Indoor, Outdoor
Stair Type
Spiral Stair
Stair Step
Solid Wood;Laminated Tempered Glass;Marble
Staircase Balustrade
Tempered Glass Balustrade or Steel Balustrade
Beam Material
Carbon Steel;Stainless Steel;Aluminum
Beam Surface
Powder Coated;Satin or Mirror
Step Riser
From 150-220mm
Stair Structural
Steel;Aluminum;Stainless Steel
Stringer
108/*4 mm
Warranty
10 Years
Handrail Options
Wood, Stainless Steel, Aluminum
Transport Package
Plywood Carton
Specification
Customized
Trademark
ACE ARCHI
Origin
China
HS Code
16
Production Capacity
5000/Set

Product Description

Spiral stairs in glass/Glass Spiral Staircase

Staircase Data:

1:What should i provide for quote ?

01:You only need providde us the staircase data as below :
Stair Data Specification Data Specification
Floor to floor height Customized Beam Thickness Dia 104*6MM
Step Lenghth 650-2000mm Step Width 250-350mm
Step Height(Riser) 150-220mm    
Staircase Components:
Components Specification Material Surface
Stringer/Beam 108*6MM or customized A3 steel;SS304/316

Powder coated;Satin or mirror finish

Stringer Support No Stringer Support A3 steel;SS304/316 Powder coated;Satin or mirror finish
Tread Support ¢25MM round tuble A3 steel;SS304/316 Powder coated;Satin or mirror finish
Tread 4mm checkered plate A3 steel;SS304/316 Paiting;Satin or mirror finish
Balustrade Vertical Post railing or Wire Balustrade A3 steel;SS304/316 satin or mirror,Painting
Handrail Stainless Steel,Wood;PVC A3 steel;SS304/316 satin or mirror,Painting
Handrail Also can make as solid timber and PVC handrail  
Checkered Plate Staircase Tread Option:
Customized Spiral Stairs Railing Balustrade Spiral Staircase with Glass Steps

Solid Wood Step Option:
Customized Spiral Stairs Railing Balustrade Spiral Staircase with Glass Steps

Laminated Tempered Glass Stair Tread:
Customized Spiral Stairs Railing Balustrade Spiral Staircase with Glass Steps
Staircase Shap Option:

Customized Spiral Stairs Railing Balustrade Spiral Staircase with Glass Steps
Our Factory And Show Room:
Customized Spiral Stairs Railing Balustrade Spiral Staircase with Glass Steps
Customized Spiral Stairs Railing Balustrade Spiral Staircase with Glass Steps

Our advantage is as below:

 1. We are a real manufacturer, not trading company, with competitive price

 2. Professional design team, will make proper suggestion for all project drawing to control or lessen purchase cost.

 3. Offer oversea take meamsurement and installation service, solve all your skill problems.

 4. With German processing machine to ensure polish quality

 5. All of our products meet material test standard from ASTM,BS2026,CE and DIN/EN 12600

6. More than 7000m2 size factory, with professional manufacturer management.

 We are a more than 15 years manufacture up to now, below is some projects we did before, share with you, any model you like

FAQ:


When do I start?
Contact us at the beginning of the design phase when you have the most options available and our expertise can be most helpful. We will meet your design requirements and bring value and dramatic design to your project. The longer you wait the more you limit your options or create unusual and costly framing changes. 

How do I start? 
Browse the website, make your choices: Type of Stair, style, wood and finishes. Once you know what you want, contact us for a site measurement.  The details to your customized project will then be reviewed and finalized in a formal contract. 

How do I order? 
We will finalize the details and send a contract for you to sign. A shop drawing will follow for approval.  A field technician will confirm field dimensions and the stairs go into production. 

When does the stair arrive? 
Once the staircase finished production and trial installation we will pack it and dliver to your jobsite, it takes around 45 days . 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier