Customization: | Available |
---|---|
Frame Finishing: | Polish |
Surface Treatment: | Polish |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Component |
Specification |
Material |
Surface Finish |
Stringer/beam |
stainless steel/ can be customized |
stainless steel/ can be customized |
Satin/polish |
Stair Steps |
Made to order |
Glass/stone/timber |
Sandblasted/varnished |
Handrail |
Made to order |
Stainless steel/timber |
Satin/Mirror Polished |
Production time:
21 to 30 working days after receipt of deposit & shop drawing approval.
Package:
1.Stainless steel parts: Pearl cotton, Carton, Woven Bag
2.Glass: wooden crate
Note:
1.Customer needs to provide us with architectural sketch, product model, and material requirements and then we will draw detailed design accordingly;.
2. Sizes and material can be changed.
3. Price varies on material and dimensions.
4. On site measurement is available; we can send our engineer to your jobsite.
5. Installation: DIY innovation, just screws + bolts fixing. No welding, also if needed, we are ready to provide installation work for you.